Homepage | Set Home | Add to Favorites
Member

Henan Shenghua Heavy Crane Co., Ltd


Search
 

Friends links
  • No link

Browse by Showcase | Browse by List Products
Picture Heading Updated
Precast Beam Erection Machinery
Shenghua Group has extensive experience erecting the many different types of precast bridge structures that are designed for specific jobsite conditions. Depending on how beams and segments are delivered to the jobsite and how close to their final locatio
2024-07-25
Precast Beam Erection Machinery
Shenghua Group has extensive experience erecting the many different types of precast bridge structures that are designed for specific jobsite conditions. Depending on how beams and segments are delivered to the jobsite and how close to their final locatio
2024-07-25
Segmental Launching
Segmental Launching is whole span box girder segment erection construction equipment, it is mainly used in the erection of precast segment viaducts for span by span and balanced cantilever methods of construction, with simple structure and easy to use, ca
2024-07-25
Bridge Girder Erection Machine
Highway bridge girder erection machine made by Shenghua Crane is designed with the double-guide beam truss structure, including walking type and rail mounted type, mainly used for the assembly of prefabricated beam segments for the overpass bridge, and th
2024-07-25
MH Gantry Crane
https://www.shenghuacranes.com/gantry-crane/gantry-crane-with-electric-hoist/mh-gantry-crane.html MH Model Electric Single Beam Gantry Crane is based on the mechanical department industry standard JB/T5663-2008 <electric hoist gantry crane type and
2024-07-25
RTG Crane
Rubber Tyre Gantry Cranes(RTG) are special equipments to remove, load and unload international standard containers. Running and moving in the yard, it has the advantage of high production efficiency and fine maneuverability, also the small sensibility to
2024-07-25
Segment Launching Gantry
The pre-stressed bridge prefabricated section is assembled by the spanning process. The principle is to divide the upper structure of the bridge into several standard sections. After the prefabrication of the prefabricated site is completed, the special e
2024-07-25
Segment Launching Gantry
The pre-stressed bridge prefabricated section is assembled by the spanning process. The principle is to divide the upper structure of the bridge into several standard sections. After the prefabrication of the prefabricated site is completed, the special e
2024-07-25
   Home   Next   Previous   Last